Plans d’Arau

BASIC INFORMATION
Year: 1990
Total surface area: 81.5 Ha (814,655 m2)
Industrial land: 364,721 m2
Public land: 449,934 m2
Land available: 10,462.24 m2

TYPE OF PLOTS:

  • Terraced:
  • Isolated (medium-sized and large):

Ownership: 45% private and 55% public

ACTIVITIES
Economic activities: metal industry, plastic materials – auxiliary automotive, paper and cardboard handling, chemical, electrical material, graphic arts, textile, food, logistics
Companies established: 75
Type: Large Corporations and Small and Medium-sized Enterprise

SUPPLIES
Water: 100% coverage – Water de Rigat, S.A.
Gas: 100% coverage – Gas Natural
Electricity: 100% coverage – Fecsa Endesa
Telephony: 100% landline and mobile cover – Telefónica
Fibre-optics: 100% coverage (operator pending)

COMMUNICATIONS AND ACCESSIBILITY
Public transport: railway station (FGC – la Pobla de Claramunt, 2.8 km)
Road connections: Freeway A2 (2.5 km) / C15 and C37 (1.4 km) / C244 (0.6 km)

DISTANCES
Barcelona Port (65 km), Tarragona Port (117 km)
El Prat Airport (60 km), Lerida Airport (95 km)
Barcelona (67 km), Igualada (7 km), Manresa (32 km), Vilafranca del Penedès (33 km), Tarragona (115 km), Lerida (100 km), Gerona (148 km), Vic (89 km)
Madrid (555 km), Bilbao (540 km), Valencia (365 km), Zaragoza (240 km)

SERVICES
Waste collection: municipal service complementing the collection of commercial waste
Disposal unit: municipal disposal unit (c/ Narcís Monturiol – Plans d’Arau Estate)
Sewers: 100% coverage
Security: Public vigilance, Mossos d’Esquadra Police
Emergencies: Primary Care Centre, Regional Hospital in Igualada

 

pdf-iconpdf-iconCompanies of the Plans d’Arau Estate

Polígons dels Plans